SOLARA
Sustainability Operations & Lifecycle Analysis Report Automation
WorkspacesChrysanthemum
Workspace · Greenhouse · existing · anonymized

Chrysanthemum — 5 locations, 32+ ha

Weekly planting optimization for a Dutch cut-flower operation, validated against the baseline planning model. Location M is live in Plan; the other four locations onboard by data intake.

Locations
The multi-site thesis

Five locations, one planning + benchmarking loop

Today · Location M

Weekly planting MILP validated against the baseline plan, then extended with the contract floor and tested on the Women's-Day price peak — see Plan.

Next · the other four

The locations already record realized prices per color, cycle durations per kap, and labor hours — Calibrate lists every stream and its status. Each intake fills a column in the multi-site benchmark.

Workspace anonymized — no grower, site, or cultivar names. Validation: the plan engine reproduces the baseline weekly plan (revenue 2025–2029, €22.24M) before optimizing; prices are estimates until realized price intake.