SOLARA
Sustainability intelligence platform
HomeDesignSite & Climate
Module 01 · Pre-build

Site & Climate

Select a candidate site and pull a year of weather, solar resource, and grid context. The boundary conditions established here propagate through every downstream module — facility energy, PV dispatch, and the environmental-impact footprint.

Site
Agadir-Massira
Morocco · 30.32° N
Annual GHI
2,090
kWh/m² · TMYx
Annual DNI
2,310
kWh/m²
Mean ambient
18.6
°C · annual avg
Grid voltage
22
kV MV interconnect
Logistics
2,260
km truck → DE consumer

Selected site — Farm32 Agadir

Satellite view of the candidate parcel. Facility footprint and PV array are drawn at true scale on the south-facing slope. Drag to pan; scroll or +/− to zoom.
Facility (26 × 25 m) PV array (~60 × 40 m, 30° south-tilt)

Why this site

Solar classA · top decile for global horizontal irradiance in the Mediterranean basin
Cooling loadModerate — mean diurnal range 11 °C; no extreme winter heating demand
Water sourceReverse-osmosis desalination available within 12 km; aquifer not used
Grid22 kV ONEE feeder at parcel boundary; net-metering available up to 500 kWp
Land statusAgricultural land, 4.2 ha lease secured for 25 years
Risk flagsCoastal salt aerosol — module cleaning regimen budgeted in Module 03

Solar resource — monthly GHI & ambient temperature

TMYx weather, file MAR_SS_Agadir-Massira.Intl.AP.602520_TMYx (climate.onebuilding.org). Months with the lowest GHI (December and January) drive the worst-case PV shortfall handled by Module 03.

Climate table — 12-month profile

Average values from the TMYx hourly file used across all SOLARA Design simulations.
MonthGHI
kWh/m²
DNI
kWh/m²
T-air
°C
RH
%
Wind
m/s

Outputs handed to downstream modules

OutputGoes toHow it is used
Hourly weather (8760 h)Module 02 — Facility EnergyEnergyPlus boundary: T-air, RH, wind, GHI/DNI/DHI
Hourly POA irradiance & PV cell temperatureModule 03 — Solar & Storagepvlib PVWatts generation curve at 30° south-tilt
Transport distance & modeModule 04 — Environmental ImpactDistribution-stage emissions per PEFCR section 5.4
Logistics & grid-tariff baselineOperateReal-time variance vs. design assumption